Political timidity (or rather, cowardice). This scale of energy (and water) usage is just insane:
"Just two companies that specialise in planning rather than data centres, Apatura and ILI Group, sit behind 11 of the 16 hyper scale applications. Those 11 alone would require over 4000 mw, more than double Scotland’s entire peak winter demand."