Y'all I'm tired and I didn't even do the hard part.
2
Replies
0
Boosts
One (double) fridge gone, two (single) fridges installed.
It took an angle grinder, removing half a door frame, and lots of swearing.
But it's done.
And the door frame is rebuilt, and the floors have all been mopped and I even managed to package some toys.