datacentre project status so far for those who give a shit:
- agreed to pricing and terms from interactive (42ru rack, 4kw power & 1x cross-connect) & aussie broadband (1gbit DIA & /28 subnet) for a total of $2626/m inc. GST, been waiting all week for them to send me a contract to sign, silence since monday arvo
- will have 30RU & 2kw spare for a while, worked out I can sub-lease this out to anyone interested for about 60c per watt per month (e.g: if your server uses 150W it's $90/m inc GST) with unlimited fair use of the 1gbit link, your own IP address, OOB/console access via tailscale and your own access card to the rack/DC
- waiting for CPUs & RAM to arrive from overseas to fill up one of the supermicro servers, ETA for CPU is 5th March, ETA for RAM is monday
- waiting to hear back from various aussie supermicro partners if they can get me an NVMe kit for my server, going to keep scouring EU & US sites in the meantime
- mucking around with virtfusion instead of proxmox for the BYO HDD idea, seems great for what i need, hope it doesn't throw any surprises at me while I'm testing it
- catching up next week with a former colleauge who is the smartest network engineer I know to get some tips & sanity check my network design so I don't fuck it up when people start paying me (i've been off the tools for a while!)
- pretty much decided on an Arista 7050TX-64 as a switch (48x 10gbps RJ45 ports & 4x 40gbps QSFP+ ports) and OPNsense as a router, I still need to decide on a cheap, but power efficient 1RU box to that has at least two 10gbps SFP ports to run it on
- building a website & community forum, along with some documentation
- eta for starting to move gear into the DC is april 13th