Good Morning, Artemis II.
🚀 😎
12/n
Good Morning, Artemis II.
🚀 😎
12/n
Crawler-transporter 2 (CT-2) has cranked up its speed. You can see the entire assembly (CT-2, mobile launcher and the NASA SLS rocket) now moving "rapidly" to the right.
14/n
Quite a sight as the massive Artemis II assembly - the Crawler-transporter 2 (CT-2), mobile launcher, the NASA SLS rocket and the Orion spacecraft - marches from the VAB to launch pad 39B at the KSC.
Large number of staff members and spectators watching the historical moment.
Almost 9 hours after the start of its epic journey, NASA Artemis II and its SLS rocket assembly aboard crawler-transporter 2 (aka CT-2 and Franz) are perched at the base of launch pad 39B, ready to make the final challenging ascent up the 2.9 degree ramp to the launch pad.
Few more pics from NASA of the day's events at the rollout of the Artemis II SLS rocket aboard crawler-transporter 2 at KSC in FL.
https://www.flickr.com/photos/nasahqphoto/albums/72177720331471551/
17/n
Standing tall!
NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA astronaut Jeremy Hansen at KSC today, ready to fly Artemis II SLS and Orion on Feb 6, 2026, for a trip around the moon.
https://images.nasa.gov/details/KSC-20260117-PH-KLS03_0048
Photographer: NASA/Kim Shiflett
18/n
The future of Space Exploration.
🚀
🪐
https://images.nasa.gov/details/KSC-20260117-PH-KLS03_0026
Photo credit: NASA/Kim Shiflett
19/n
Here is a hi-res image of the Artmeis II SLS rocket and Orion spacecraft, secured to the mobile launcher, as the Crawler-transporter 2 rolls it out of the Vehicle Assembly Building at KSC, Saturday morning.
Compare with the image in post #12, which looks a bit more aesthetically pleasing.
Full res image at https://www.flickr.com/photos/nasahqphoto/55046581023/in/album-72177720331471551/
More images at https://www.flickr.com/photos/nasahqphoto/albums/72177720331471551/with/55044924877
21/n