Discussion
Loading...

Post

Log in
  • About
  • Code of conduct
  • Privacy
  • Users
  • Instances
  • About Bonfire
Pekka Tahkola
Pekka Tahkola
@pekkatahkola@mas.to  路  activity timestamp last week

Just a reminder that on the bike & footh paths here in Oulu 馃嚝馃嚠, 2 cm of new snowfall must always be gone within 3 hours, on entire 166 km main 馃毑馃毝 network, 24/7. Maintenance needs to be fast, reliable & efficient, so that people can rely on it 馃憣 Join our Urbanism Masterclasses to learn more! 馃
#MeanwhileInOulu #CityMasterclass

Your browser does not support the video tag.
This video cannot be previewed
Open original
Video showing me cycling on a wide bicycle & foot path, that's at the same time being cleared of snow by a big tractor.
  • Copy link
  • Flag this post
  • Block
Pekka Tahkola
Pekka Tahkola
@pekkatahkola@mas.to replied  路  activity timestamp last week

In addition to the 2 cm threshold, 4 cm accumulation of snow must never be reached, not even for a second, on the main network. The rest of the ~1000 km network of bicycle & foot paths in the city are naturally maintained at top priority as well 馃憣
Our next Masterclass is scheduled for 8-11 February 2026. There are still places left, so head on to www.masterclass.city and secure your spot 馃

  • Copy link
  • Flag this comment
  • Block

bonfire.cafe

A space for Bonfire maintainers and contributors to communicate

bonfire.cafe: About 路 Code of conduct 路 Privacy 路 Users 路 Instances
Bonfire social 路 1.0.1-beta.35 no JS en
Automatic federation enabled
Log in
  • Explore
  • About
  • Members
  • Code of Conduct