☕ Good Morning Homelabs ☕
Freitagsgrußküsse von dem 💤 verschlafenen 🌞 annnyway, new place, new in-wall panel of cat6 terms and a 5GbE symmetric fiber line. I cleaned up the initial mess in June, second iteration this past week/ish. Generally, most of this hardware should be in one of the office racks (1U switch + 2x 0.5U patches + 1U UPS), specifically NOT in my walk-in closet. It's a work in progress.

iteration number two, not horrible, needs more ethernet cable management and etc etc

in-between iterations, the OnQ parts arrived so mostly everything was removed. the two fiber boxes (shitty Comcast, and decent ATT) have to stay put.

first iteration of the telco panel rebuild, just a bit messy