Discussion
Loading...

Post

  • About
  • Code of conduct
  • Privacy
  • Users
  • Instances
  • About Bonfire
muppeth
@muppeth@fe.disroot.org  ·  activity timestamp 3 weeks ago

Last week was just more of the same. we spent entire time working on the plastering and polishing in the bathroom. Still need to finalize some places (mostly around the toilet) but the rest has been polished and we also put a protective layer of olive soap mix. Walls are super smooth and a bit reflective as well. This week is a work week so not much building. But next week we should manage to finish last two walls.

I have to say it's been exhausting week. Tadelakt requires so much labor no wonder hiring someone to do it costs an arm and a leg. Much respect to those who do it for living.
#diy#spruitje

Drying wall with two little glass tiles and ventilation
Drying wall with two little glass tiles and ventilation
Drying wall with two little glass tiles and ventilation
Freshly initially polished wall
Freshly initially polished wall
Freshly initially polished wall
View on the drying wall
View on the drying wall
View on the drying wall
Beginning the polishing process of the toiler shelfs
Beginning the polishing process of the toiler shelfs
Beginning the polishing process of the toiler shelfs
  • Copy link
  • Flag this post
  • Block
Log in

bonfire.cafe

A space for Bonfire maintainers and contributors to communicate

bonfire.cafe: About · Code of conduct · Privacy · Users · Instances
Bonfire social · 1.0.0-rc.3.1 no JS en
Automatic federation enabled
  • Explore
  • About
  • Members
  • Code of Conduct
Home
Login