Discussion
Loading...

Post

  • About
  • Code of conduct
  • Privacy
  • Users
  • Instances
  • About Bonfire
Tom
@Tallish_Tom@mastodon.scot  ·  activity timestamp 3 months ago

https://www.forbes.com/sites/kensilverstein/2025/02/09/masdars-solar-plus-battery-project-will-redefine-reliable-energy/

1GW baseload power from solar and batteries. Build should take about 2 years (solar + batteries have excellent project predictability). Cost is $6 billion but with that lead time and confidence, the loan costs will be quite low (even lower if tranches come on line sooner).

With the plummeting costs of BESS particularly I think this will be the first of many.

#solar #renewables #bess #batteries

  • Copy link
  • Flag this post
  • Block
Log in

bonfire.cafe

A space for Bonfire maintainers and contributors to communicate

bonfire.cafe: About · Code of conduct · Privacy · Users · Instances
Bonfire social · 1.0.0-rc.3.13 no JS en
Automatic federation enabled
  • Explore
  • About
  • Members
  • Code of Conduct
Home
Login